logo
photo
 

Document Downloads - Resource Reports - Final Draft

The following are PDF documents related to our Oregon LNG and Oregon Pipeline projects.
NOTE: Some of these documents are quite large. Documents can range in size from
under 1Mb to over 130Mb. Please allow sufficient time for downloading.

    Resource Report #1: General Project Description
             Appendix 1A: Figures referenced in Resource Report 1 - Part 1
             Appendix 1A: Figures referenced in Resource Report 1 - Part 2
             Appendix 1B: Oregon LNG Terminal Design Drawings
             Appendix 1D: Topographic Maps of Proposed Pipeline Route (cover)
                     Appendix 1D-1: Topographic Map
                     Appendix 1D-2: Topographic Map
                     Appendix 1D-3: Topographic Map
                     Appendix 1D-4: Topographic Map
                     Appendix 1D-5: Topographic Map
                     Appendix 1D-6: Topographic Map
                     Appendix 1D-7: Topographic Map
                     Appendix 1D-8: Topographic Map
                     Appendix 1D-9: Topographic Map
                     Appendix 1D-10: Topographic Map
                     Appendix 1D-11: Topographic Map
                     Appendix 1D-12: Topographic Map
                     Appendix 1D-13: Topographic Map
                     Appendix 1D-14: Topographic Map
                     Appendix 1D-15: Topographic Map
                     Appendix 1D-16: Topographic Map
                     Appendix 1D-17: Topographic Map
                     Appendix 1D-18: Topographic Map
                     Appendix 1D-19: Topographic Map
                     Appendix 1D-20: Topographic Map
                     Appendix 1D-21: Topographic Map
                     Appendix 1D-22: Topographic Map
                     Appendix 1D-23: Topographic Map
             Appendix 1E: Existing and Proposed Roads Required - part 1
             Appendix 1E: Existing and Proposed Roads Required - part 2
             Appendix 1F: List of New and Existing Access Roads Required
             Appendix 1H: Topographic Maps of Proposed Lateral Route (cover)
                     Appendix 1H-1: Topographic Map - Lateral Route
                     Appendix 1H-2: Topographic Map - Lateral Route
                     Appendix 1H-3: Topographic Map - Lateral Route
             Appendix 1I: Cathodic Protection System and Electrical Grounding Component Locations
             Appendix 1J: Residential Mitigation Plans for Proposed Pipeline Route - Part 1
             Appendix 1J: Residential Mitigation Plans for Proposed Pipeline Route - Part 2
             Appendix 1K: Wetland and Waterbody Crossing Methods
             Appendix 1L: Fish Screening for LNGC Sea Chests
             Appendix 1M: Affected Landowners
             Appendix 1N: List of Stakeholders

             Agency Correspondence
             Appendix 1O-1: Federal Agencies
             Appendix 1O-1: Federal Energy Regulatory commission
             Appendix 1O-1: National Oceanic and Atmospheric Administration
             Appendix 1O-2: State Agencies
             Appendix 1O-2: Oregon Department of Forestry
             Appendix 1O-2: Oregon Department of Forestry - Part 2
             Appendix 1O-2: Oregon Department of Fish and Wildlife
             Appendix 1O-2: Oregon Natural Heritage Information Center
             Appendix 1O-3: Local Agencies
             Appendix 1O-3: Clatsop County
             Appendix 1O-3: Columbia River Solutions Group
             Appendix 1O-3: Tillamook County
             Appendix 1O-4: Tribal consultation
             Appendix 1O-5: Interagency Meetings
             Appendix 1O-5: Interagency Meeting Notes
             Appendix 1O-5: Interagency Meeting Notes
             Appendix 1O-5: Interagency Meeting Notes

             Resource Report #1: Final Pipeline Alignment Sheets

    Resource Report #2: Water Use and Quality
             Appendix 2A: FERC Wetland and Waterbody Construction and Mitigation Procedures
             Appendix 2B: Private and Public Water Wells Near the Proposed Project
             Appendix 2C: Stormwater Pollution Prevention Plan
             Appendix 2D: Surface Waterbodies Crossed by the Proposed Pipeline and Lateral
             Appendix 2E: Dredge Material Characterization Report - Part 1
             Appendix 2E: Dredge Material Characterization Report - Part 2
             Appendix 2E: Dredge Material Management Plan
             Appendix 2E: Dredge Material Sampling and Analysis Plan
             Appendix 2F: Vessel Cooling Water Discharge Analysis
             Appendix 2G: Wetland Delineation Report
             Appendix 2H: National Wetlands Inventory Mapping
             Appendix 2I: Wetlands Affected by Construction and Operation of the Project
             Appendix 2J: Wetland Mitigation Plan
             Appendix 2K: Site-Specific Drawings of Workspaces Requiring Variances

    Resource Report #3: Fish, Wildlife and Vegetation
             Appendix 3A: Wildlife Technical Memoranda
             Appendix 3B: Supplemental Information on Fish and Invertebrates
             Appendix 3C: Summaries of Impacts and Mitigation
             Appendix 3D: Sensitive Species Impacts and Mitigation
             Appendix 3D: Wildlife Surveys
             Appendix 3D: Wildlife Surveys
             Appendix 3D: Plant Surveys
             Appendix 3E: Historical Aerial Photographs - Skipanon Peninsula
             Appendix 3F: Potential Effects Along the Marine Transit Route

    Resource Report #4: Cultural Resources
             Appendix 4A: Plan and Procedures for Unintended Cultural Discoveries
             Appendix 4B: Cultural Resources Survey and Evaluation REport
             Appendix 4C: Areas Effected Along Pipeline Route
                     Appendix 4C: Topographic Map - Section 1
                     Appendix 4C: Topographic Map - Section 2
                     Appendix 4C: Topographic Map - Section 3
                     Appendix 4C: Topographic Map - Section 4
                     Appendix 4C: Topographic Map - Section 5
                     Appendix 4C: Topographic Map - Section 6
                     Appendix 4C: Topographic Map - Section 7
                     Appendix 4C: Topographic Map - Section 8
                     Appendix 4C: Topographic Map - Section 9
                     Appendix 4C: Topographic Map - Section 10
                     Appendix 4C: Topographic Map - Section 11
                     Appendix 4C: Topographic Map - Section 12
                     Appendix 4C: Topographic Map - Section 13
                     Appendix 4C: Topographic Map - Section 14
                     Appendix 4C: Topographic Map - Section 15
                     Appendix 4C: Topographic Map - Section 16
                     Appendix 4C: Topographic Map - Section 17
                     Appendix 4C: Topographic Map - Section 18
                     Appendix 4C: Topographic Map - Section 19
                     Appendix 4C: Topographic Map - Section 20
                     Appendix 4C: Topographic Map - Section 21
                     Appendix 4C: Topographic Map - Section 22
                     Appendix 4C: Topographic Map - Section 23
                     Appendix 4C: Topographic Map - Section 24
                     Appendix 4C: Topographic Map - Section 25
                     Appendix 4C: Topographic Map - Section 26
                     Appendix 4C: Topographic Map - Section 27
                     Appendix 4C: Topographic Map - Section 28
             Appendix 4D: Scope of Work for Research Design and Field Survey Methods
             Appendix 4E: Legal Descriptions of Proposed Pipeline, Lateral and Terminal
             Appendix 4F: Cultural Resources Survey Completion Status

    Resource Report #5: Socioeconomics
             Appendix 5A: Economic and Socioeconomic analysis
             Appendix 5B: Net Economic Impact Analysis
             Appendix 5C: Property Values - Evidence from Clackamas and Washington Counties
             Appendix 5D: Pipeline Impact on Property Taxes
             Appendix 5E: Traffic Impact Study

    Resource Report #6: Geological Resourcess
             Appendix 6A: Figures Referenced in Resource Report 6 - Part 1
             Appendix 6A: Figures Referenced in Resource Report 6 - Part 2
             Appendix 6A: Figures Referenced in Resource Report 6 - Part 3
             Appendix 6B: Preliminary Assessment of Geologic Conditions
             Appendix 6C: Geologic Units Underlying Proposed Project

    Resource Report #7: Soils
             Appendix 7A: Soil Maps
             Appendix 7B: Characteristics of Soil Mapping Units
             Appendix 7C: Soil Map Unit Descriptions
             Appendix 7D: Mileposts and Acreages of Soil Mapping Units for Pipeline
             Appendix 7E: Mileposts and Acreages of Soil Mapping Units along Lateral
             Appendix 7F: FERC's Erosion Control, Revegetation and Maintneance Plan
             Appendix 7G: NRCS Revegetation Guidelines
             Appendix 7H: Agricultural Assessmant
             Appendix 7I: Agricultural Impact Mitigation Plan
             Appendix 7J: Site-Specific Terminal Revegetation and Restoration Plan

    Resource Report #8: Land Use, Recreation and Aesthetics
             Appendix 8B: Oregon LNG Terminal Visual Impact Assessment
             Appendix 8C: Additional Temporary Workspaces Required for Pipeline Construction

    Resource Report #9: Air and Noise Quality
             Appendix 9A: Emission Calculations
             Appendix 9B: Ship Modeling Analysis Report
             Appendix 9C: Air Contaminant Discharge Permit Application
             Appendix 9D: Water Vapor Plume Study
             Appendix 9E: Oregon Pipeline Noise Survey and Analysis Report
             Appendix 9F: Oregon LNG Terminal Noise Survey and Analysis Report

    Resource Report #10: Alternatives
             Appendix 10A: Proposed and Alternative Terminal and Pipeline Routes - Part 1
             Appendix 10A: Proposed and Alternative Terminal and Pipeline Routes - Part 2
             Appendix 10A: Proposed and Alternative Terminal and Pipeline Routes - Part 3
             Appendix 10A: Proposed and Alternative Terminal and Pipeline Routes - Part 4
             Appendix 10A: Proposed and Alternative Terminal and Pipeline Routes - Part 5
             Appendix 10A: Proposed and Alternative Terminal and Pipeline Routes - Part 6
             Appendix 10A: Proposed and Alternative Terminal and Pipeline Routes - Part 7
             Appendix 10A: Proposed and Alternative Terminal and Pipeline Routes - Part 8
             Appendix 10A: Proposed and Alternative Terminal and Pipeline Routes - Part 9
             Appendix 10A: Proposed and Alternative Terminal and Pipeline Routes - Part 10
             Appendix 10A: Proposed and Alternative Terminal and Pipeline Routes - Part 11
             Appendix 10A: Proposed and Alternative Terminal and Pipeline Routes - Part 12
             Appendix 10A: Proposed and Alternative Terminal and Pipeline Routes - Part 13
             Appendix 10A: Proposed and Alternative Terminal and Pipeline Routes - Part 14
             Appendix 10A: Proposed and Alternative Terminal and Pipeline Routes - Part 15
             Appendix 10A: Proposed and Alternative Terminal and Pipeline Routes - Part 16
             Appendix 10A: Proposed and Alternative Terminal and Pipeline Routes - Part 17
             Appendix 10A: Proposed and Alternative Terminal and Pipeline Routes - Part 18
             Appendix 10A: Proposed and Alternative Terminal and Pipeline Routes - Part 19
             Appendix 10A: Proposed and Alternative Terminal and Pipeline Routes - Part 20
             Appendix 10C: Proposed and Alternative Terminal and Pipeline Routes - Part 1
             Appendix 10C: Proposed and Alternative Terminal and Pipeline Routes - Part 2
             Appendix 10D: Proposed and Alternative Terminal and Pipeline Routes
             Appendix 10D: Proposed and Alternative Terminal and Pipeline Routes - Part 1
             Appendix 10D: Proposed and Alternative Terminal and Pipeline Routes - Part 2
             Appendix 10D: Proposed and Alternative Terminal and Pipeline Routes - Part 3
             Appendix 10D: Proposed and Alternative Terminal and Pipeline Routes - Part 4
             Appendix 10D: Proposed and Alternative Terminal and Pipeline Routes - Part 5
             Appendix 10D: Proposed and Alternative Terminal and Pipeline Routes - Part 6
             Appendix 10D: Proposed and Alternative Terminal and Pipeline Routes - Part 7
             Appendix 10D: Proposed and Alternative Terminal and Pipeline Routes - Part 8
             Appendix 10D: Proposed and Alternative Terminal and Pipeline Routes - Part 9
             Appendix 10D: Proposed and Alternative Terminal and Pipeline Routes - Part 10
             Appendix 10D: Proposed and Alternative Terminal and Pipeline Routes - Part 11
             Appendix 10D: Proposed and Alternative Terminal and Pipeline Routes - Part 12
             Appendix 10D: Proposed and Alternative Terminal and Pipeline Routes - Part 13
             Appendix 10E: Proposed and Alternative Terminal and Pipeline Routes
             Appendix 10F: Proposed and Alternative Terminal and Pipeline Routes
             Appendix 10G: Proposed and Alternative Terminal and Pipeline Routes - Part 1
             Appendix 10G: Proposed and Alternative Terminal and Pipeline Routes - Part 2
             Appendix 10H: Proposed and Alternative Terminal and Pipeline Routes
             Appendix 10I: Proposed and Alternative Terminal and Pipeline Routes
             Appendix 10J: Proposed and Alternative Terminal and Pipeline Routes
             Appendix 10K: Proposed and Alternative Terminal and Pipeline Routes - Part 1
             Appendix 10K: Proposed and Alternative Terminal and Pipeline Routes - Part 2

    Resource Report #11: Reliability and Safety
             Appendix 11A: Thermal Radiation and Vapor Dispersion Calculations for Import Terminal
             Appendix 11B: Integrrity Management Plan
             Appendix 11C: High Consequence Area Locations
             Appendix 11D: Class Locations
             Appendix 11E: Operations, Maintenance, and Emergency Procedures Manuals
             Appendix 11F: Eemergency Response Plan

    Resource Report #12: PCB Contamination

    Resource Report #13: Engineering and Design Material
             Resource Report #13 - Master Index
             Appendix 13A: Organizational Chart
             Appendix 13B: Construction Schedule
             Appendix 13C: Engineering Design Standard
             Appendix 13C: Design Basis
             Appendix 13C: Estimated Condensation Rate for Ambient Air Vaporization
             Appendix 13C: Hazard Detection and Mitigation Philosophy
             Appendix 13C: LNG Vaporization Study
             Appendix 13C: Rainfall Design Basis
             Appendix 13C: Oregon LNG Terminal Water Vapor Plume Study
             Appendix 13C: Seismic and Structural Design Criteria for Terminal Equipment and Structures
             Appendix 13C: Marine Facilities Design Criteria
             Appendix 13D: Design Codes and Standards
             Appendix 13F: Demonstration of Code Compliance
             Appendix 13H: Management of Change and Reporting
             Appendix 13I: Site-Specific Seismic Hazard Evaluation for the Import Terminal
                     Appendix 13I: Base Ground Motion Characterization - Part 1
                     Appendix 13I: Site Response Analysis - Part 2
                     Appendix 13I: Recommended Design Response Spectra - Part 3
                     Appendix 13I: Seismic Technical Memorandum - Part 4
                     Appendix 13I: Attenuation Relationship Weightings - Part 5
             Appendix 13I: Coastal and Hydraulic Modeling Study
             Appendix 13I: FERC Seismic Design Guidelines
             Appendix 13I: Seismic Categorization
             Appendix 13J: Geotechniocal Investigation Report
             Appendix 13J: Geotechniocal Data Report
             Appendix 13J: Supplemental Geotechniocal Data Report
             Appendix 13J: Determination of Soil Parameters
             Appendix 13J: Liquefaction Potential and Post-Liquefaction Settlement Calculations
             Appendix 13J: DMOD-2000 Analyses
             Appendix 13J: Seismic Slope Stability and Displacement
             Appendix 13J: Foundation Calculations
             Appendix 13J: Seismic Instrumentation
             Appendix 13Q: Thermal Radiation and Vapor Dispersion Calculations
             Appendix 13Q: Thermal Radiation Exclusion Zone Isopleth
             Appendix 13Q: Vapor Dispersion Exclusion Zone Isopleth
             Appendix 13Q: LNG Spill Containment Plot Plan
             Appendix 13R: LNG Storage Tank Alternatives
             Appendix 13R: Vaporizer Alternatives Study
             Appendix 13R: Key 'Efficiency in Design' Considerations
             Appendix 13U: Access Road to Oregon LNG Terminal
             Appendix 13U: Facility Pilot Plan Overview
             Appendix 13U: Facility Layout - Unloading Platform
             Appendix 13U: Facility Layout - Pier
             Appendix 13U: Facility Layout - Tanks T-201A and T-201B
             Appendix 13U: Facility Layout - Tank T-201C and Low Pressure Process Area
             Appendix 13U: Facility Layout - Process Areas
             Appendix 13U: Facility Layout - Utilities and Administrative Areas
             Appendix 13U: Stormwater and Condensate System Utility Flow Diagram
             Appendix 13U: Water Balance Diagram
             Appendix 13U: Process Flow Diagram - Ship Unloading
             Appendix 13U: Process Flow Diagram - No Ship Unloading
             Appendix 13U: Heat Transfer System - Utility Flow Diagram
             Appendix 13U: Firewater System - Utility Flow Diagram
             Appendix 13U: Potable Water System - Utility Flow Diagram
             Appendix 13U: Service Water System - Utility Flow Diagram
             Appendix 13U: Instrument Air and Service Air System - Utility Flow Diagram
             Appendix 13U: Nitrogen System - Utility Flow Diagram
             Appendix 13U: Zero Sendout Without Carrier Unloading
             Appendix 13U: Minimum Sendout With Carrier Unloading
             Appendix 13U: Minimum Sendout Without Carrier Unloading
             Appendix 13U: Peak Sendout With Carrier Unloading



Oregon Pipeline : Tel: 503.298.4969 : 5 N. Highway 101, #500, Warrenton, OR 97146 : Email: info@oregonpipelinecompany.com